STONE / SCRAP ESTIMATION
Stone & marble scrap estimator.
Model the extra slab area required after applying an assumed waste allowance.
ILLUSTRATIVE EXTRA MATERIAL COST
26.5 ft²Additional material
176.5 ft²Total slab allowance
Formula: slab area = finished area ÷ (1 − wastage fraction). Slab layout, veining, cut-outs, size and fabrication constraints change real yield.